Chennai, Sep 10,2023: The third earth-bound manoeuvre of the Aditya-L1, India’s maiden solar exploratory mission to study the sun, was successfully performed by the Indian Space Research Organisation (ISRO).
The orbit raising was performed at ISRO Telemetry, Tracking and Command Network (ISTRAC), Bengaluru at 0230 hrs early on Sunday morning.
ISRO’s ground stations at Mauritius, Bengaluru, SDSC-SHAR and Port Blair tracked the satellite during this operation.
The new orbit attained was 296 km x 71767 km.
The next manoeuvre (EBN#4) is scheduled for September 15, 2023, around 02:00 Hrs IST.
In an update ISRO said “Aditya-L1 Mission: The third Earth-bound manoeuvre(EBN#3) is performed successfully from ISTRAC, Bengaluru. ISRO’s ground stations at Mauritius, Bengaluru, SDSC-SHAR and Port Blair tracked the
satellite during this operation.”
“The new orbit attained is 296 km x 71767 km. The next manoeuvre (EBN#4) is scheduled for September 15, 2023, around 02:00 Hrs. IST”, it said.
Bengaluru, Aug 24,2023: Pragyan rover has ramped down from Vikram lander and has taken a walk on the moon, ISRO said after the successful and historic soft landing of Chandrayaan-3 on the south pole of the Moon.
“Made in India, Made for the Moon, The Ch-3 Rover ramped down from the Lander and India took a walk on the moon!” ISRO Xed. Indian National Space Promotion and Authorisation Centre Chairman Pawan K Goenka shared the first picture of this historic event.
Before Chandrayaan-3 soft-landed on the Moon at 6.04 pm, the lander chose a safe and flat region on the lunar surface for the landing.
Pragyan will conduct a series of experiments around 500 meters on the Moon surface for the next 14 days and send the collected data to Vikram. It weighs 26kg and has two payloads.
One payload will analyse the chemical composition of the Moon surface, another will determine the elemental composition of the Moon soil and rocks around the landing site.
Aug 18,2023: Chandrayaan-3 begins its final countdown to a successful Moon landing. The Indian spacecraft performed a successful separation of the Vikram lander module from the propulsion module on 17 August, ISRO informed. Now, only a few days are left before the lander module will make an attempt to do a soft landing on the south polar region of the Moon on 23 August. If the Chandrayaan-3 mission succeeds, India will become the fourth country to master the technology of soft-landing by a robotic lunar rover on the Moon’s surface after the US, China, and the former Soviet Union.
Chennai, Aug 14,2023: After the third moon mission Chandrayaan-3,the Indian Space Research Organisation (ISRO) is getting ready for the launch of Aditya-L1 Solar Exploratory mission to study the Sun, from the spaceport of Sriharikota.
ISRO will be using its reliable and workhorse launch vehicle PSLV for the Sun mission.
ISRO on Monday said “PSLV-C57/Aditya-L1 Mission: Aditya-L1, the first space-based Indian observatory to study the Sun is getting ready for the launch.”
The satellite was realised at the U R Rao Satellite Centre (URSC),Bengaluru and has arrived at SDSC-SHAR, Sriharikota, it said, in an update on the Sun mission.
Chennai, Aug 14,2023: India’s third Lunar Mission Chandrayaan-3 on Monday commenced the Orbit circularisation phase after its orbit was reduced for the third time.
After today’s precise maneuvre performed between 1130hrs & 1230hrs it has achieved a near-circular orbit of 150- km x 177 km. The next Operation is planned on Wednesday when the the propulsion module will separate from the lander ahead of the soft landing on the South pole region of the moon on August 23 evening.
In an update ISRO said “Chandrayaan-3 Mission: Orbit circularisation phase commences.
“Precise maneuvre performed today has achieved a near-circular orbit of 150 km x 177 km”.
The next operation is planned for August 16, 2023, around 0830 hrs, it said.
The Indian Space Research Organisation (ISRO) had on August 9 successfully performed the second crucial maneuvre to further reduce the Orbit of the Chandrayaan-3 spacecraft and took it even closer to the moon’s surface.
After the second operation, the orbit of Chandrayaan-3’s was reduced to 174 km x 1437 km and was taken further closer to the moon, it said.
After the Chandrayaan-3 spacecraft was injected into the Lunar Orbit on August 5, it had successfully underwent the first planned Orbit reduction manoeuver late on night of April 6.
The retrofiring of engines has brought the spacecraft closer to the Moon’s surface to 170 X 4313 km.
This maneuver was the first in a series of maneuvers planned to gradually reduce Chandrayaan-3’s Orbit and position it over the Lunar poles.
“As the mission progressed, a series of maneuvers were done to to gradually reduce the Chandrayaan-3’s orbit and position it over the lunar poles”, ISRO said.
After some maneuvers, the propulsion module will separate from the lander while in orbit. Following that, a series of complex braking maneuvers will be executed to facilitate a soft landing in the hitherto unexplored South Polar region of the Moon on August 23. The Space Agency said the health of Chandrayaan-3 is normal.
“Throughout the mission, the health of the spacecraft is being continuously monitored from the Mission Operations Complex (MOX) at ISRO Telemetry, Tracking, and Command Network (ISTRAC), the Indian Deep Space Network (IDSN) antenna at Byalalu, near Bengaluru, with the support from European Space Agency (ESA) and JPL Deep space antenna.